Delnorth and Signfix on the M1 extension

Delnorth and Signfix supply roadside delineation products and frangible sign supports for the M1 Pacific Motorway extension to Raymond Terrace.

If you’ve ever been stuck in traffic at Hexham or Heatherbrae, you will know just how important the M1 extension is for the region.

Delnorth supplied Seymour Whyte and the John Holland Gamuda joint venture construction teams with Lane-Flex flexible bollards, Flexi360 and Steel-Flex guideposts, and Hylyte delineation products. Signfix and Optimast frangible signposts were also used throughout the project through Transport for NSW.

We are proud to contribute to a project that is so important to the region.

Orange Lane-Flex flexible bollards along the M1 Pacific Motorway extension

The project

The M1 Pacific Motorway extension to Raymond Terrace opened on 11 September 2026, adding 15 kilometres of motorway between Black Hill and Raymond Terrace, finally closing a long-standing gap on the Sydney to Brisbane corridor. The extension bypasses Hexham and Heatherbrae, connecting the existing M1 at Black Hill with the Pacific Highway at Raymond Terrace. The project was completed in two sections.

Seymour Whyte completed the five-kilometre northern section, known as the Heatherbrae Bypass, between Tomago and Raymond Terrace. This included the Raymond Terrace interchange, a new Masonite Road overpass, and a bridge over Windeyers Creek.

The John Holland Gamuda joint venture completed the 10-kilometre southern section, stretching from Black Hill to Tomago. This part of the project featured what has been hailed as ‘a landmark 2.6-kilometre viaduct across the Hunter River and floodplain’, as well as crossings over the Main North Rail Line and the New England Highway.

The NSW Government expects the extension to cut peak-hour travel by seven to nine minutes and remove up to 25,000 vehicles a day from the local roads. These sections create a continuous route, helping drivers avoid some of the region’s busiest congestion points.

Truck passing Lane-Flex bollards on the M1 Pacific Motorway extension

Our contribution

Lane-Flex bollards: helping drivers follow the road

The Seymour Whyte and John Holland construction teams installed Lane-Flex flexible bollards in both sections, with different configurations at each end of the extension.

On the north side, Seymour Whyte used yellow 1-metre Lane-Flex bollards with removable socket bases (LF1MY-RSB). This configuration lets crews and emergency vehicles quickly remove and reinstall the bollards in the same mounting position as needed. It also deters traffic from entering highway crossings and emergency vehicle turning bays, reducing incidents caused by U-turns and highway crossovers.

Yellow Lane-Flex bollards with removable socket bases on the M1 extension median

On the southern side, the John Holland Gamuda joint venture used orange 1-metre Lane-Flex bollards (LF1M). Project photos show how a line of bollards marks the separated space beside moving traffic. The upright shape and reflective bands give drivers a clear visual guide where lanes merge or split to exit.

Orange Lane-Flex bollards marking a lane split on the M1 extension

Lane-Flex bollards are made in Australia from UV-stabilised polyurethane. They help drivers see lane separation in low-light and night-time conditions, and their flexible design is ideal for areas where vehicle impacts may occur.

Flexi360 and Steel-Flex guideposts: marking the road edge

Flexi360 Surface Mount, Flexi360 Pro, and Steel-Flex guideposts are installed throughout both sections of the extension, giving drivers road-edge reference points through bends and when approaching connecting lanes.

Flexi360 Surface Mount mounts to concrete and other hard surfaces, while Flexi360 Pro can be installed quickly with a mechanical driver. Both guideposts have a 360-degree flexible joint that lets posts bend when hit from any direction and return to an upright position.

Steel-Flex guideposts offer a flexible steel option that returns to vertical after repeated impacts, resists corrosion, and clearly delineates the road edge.

Close view of a guidepost on a bend of the M1 extension
Guideposts marking the road edge where an M1 extension ramp merges

Hylyte: delineating barriers and kerbs

On the northern section, Seymour Whyte installed Hylyte concrete barrier (DCBE10) and Jersey kerb delineation products.

The Hylyte barrier delineator range is made in Australia using UV-stabilised materials and reflective film, with multiple configurations for various guardrail and barrier applications.

The barrier and kerb delineators provide reflective reference points, helping drivers follow the road with headlights ensuring continuous delineation where guardrail and concrete barriers are placed, reducing impacts with oncoming traffic, guardrails and concrete barriers in low-light and night conditions.

Signfix and Optimast: supporting signs with frangible posts

Extending our contribution beyond delineation to road sign support structures, Seymour Whyte and the John Holland Gamuda joint venture teams also installed Signfix and Optimast frangible signposts throughout the Transport for NSW M1 extension project.

Sign supports are an important part of the roadside sign system. Signfix and Optimast frangible sign support systems are MASH-rated and safely support small and large guide signs.

The frangible aluminium posts are designed to shear away safely, reducing risk to vehicle occupants in a collision and helping reduce the hazard of rigid roadside supports. These products have been tested to MASH TL3 requirements.

These systems work alongside Delnorth’s flexible delineation products across the extension. While delineation helps drivers stay on the road, Signfix and Optimast frangible sign supports reduce occupant risk if an errant vehicle leaves the road and hits a post.

Guideposts and guide sign on an M1 extension ramp

Gallery

Supporting the roads we use every day

The M1 extension is a major engineering achievement that brings everyday benefits to people who live, work, and travel through the Hunter.

With our manufacturing hub in Thornton, this project is close to home for the Delnorth team, who are already seeing the benefits.

If you have a road or infrastructure project and would like to know how we can support the delivery of roadside products, contact our team today.

Related Case Studies

Innovative solution to Cairns road safety issue

Cairns Regional Council needed a cost-effective solution to alert motorists to a potentially dangerous open drain alongside a busy road….

How Steel-Flex® survived a bushfire in Southwest WA

Steel-Flex® is the world’s toughest delineator post, designed to provide a high level of protection against repeated impacts. The product…

Delnorth’s traffic management solutions for Capricorn Highway in Rockhampton

Delnorth was approached by Road Tek Rockhampton to supply products for a project on the Capricorn Highway in Gracemere, Rockhampton….